Manufacturing industries which rely on high temperature thermal processing equipment will generally consume substantial levels of energy and maintain a significant carbon footprint.
The need to substantially reduce emissions is a global agenda and as fuel prices continue to escalate, the emphasis on reducing such liabilities has increased dramatically. Identifying tangible ways of realising meaningful and sustainable savings may not be so simple, at least not without considerable investment in costly process changes, plant or equipment. However there is a way…………
FuelSave represents a paradigm shift away from convention refractory and ceramic coating technologies – an imperative step in our quest for a viable long-term permanent High Emissivity Coating solution.
An installation of FuelSave is normally completed in ONE DAY irrespective of furnace size.
Case histories demonstrate that the return on investment may be as low as TWO months, with 4-8 months being the average in steel reheating furnaces, ceramic roller hearth kilns, tunnel kilns or fired heaters when operating at nominal capacity continuously.
All continents are supported by a professional team of project engineers, supervisors and installers.
Billet & Slab Reheating Furnaces, Travelling Grate Pelletising Furnaces, Sinter Plant, Ladle & Trough Covers, DRI Plant, Forge Furnaces, Annealing Furnaces.
Roller Hearth Kilns, Tunnel Kilns, Shuttle & Batch Kilns
Fired Heaters, Primary & Secondary Reformers, Cracking Furnaces, Sulphur Recovery Units, Thermal Oxidisers, Waste Incinerators, Boilers.
Power Generation Boilers, Incinerators, Steam Recovery Generators Crematorium, Aluminium Melting Furnaces, Carbon Bake Furnaces Glass Tanks, Pot Furnaces
Over 300 Installations
Over 50 Countries
Over 1000000 Webviews
扫一扫关注公众号